How to Lay a Patio

    By Mike, MRL Gardening & Landscaping. Published .

    To lay a patio, you dig out the area, lay and compact a sub-base, set each slab on a full bed of mortar with a slight fall away from the house, then fill the joints once the bed has set. Getting the groundwork and the fall right matters far more than the slabs you choose.

    This guide walks through each stage, using the figures paving manufacturers publish for a standard garden patio. Always check the instructions for your own slabs, because porcelain, natural stone and concrete each have their own requirements.

    1. Plan the size, level and fall

    Mark the area out with pegs and string. Then work out two things before you dig: where the finished surface will sit, and which way water will run off it.

    • Keep the finished patio at least 150mm below any damp-proof course in the house wall. That is usually two courses of brick.
    • Set a fall of around 1 in 60, roughly 17mm for every metre, so rain runs off rather than sitting on the surface.
    • Run the fall away from the house, towards a lawn, a border or a drain, and never towards a neighbour's property.
    • In a front garden in England, covering more than 5 square metres with a surface that does not let water drain through needs planning permission, unless the water runs to a lawn or border. Back garden patios are not affected by this rule.

    On a sloping plot, which is most plots in North Devon, a flat patio often needs a retaining wall or steps first. Plan that in at the start rather than trying to fix it later.

    2. Dig out to the right depth

    For a standard garden patio, manufacturers such as Bradstone suggest digging out to a total depth of around 150mm below the finished level. That leaves room for roughly 100mm of compacted sub-base, a 30mm mortar bed and the slab itself. Thicker slabs, soft ground or clay can mean digging deeper.

    Take out all topsoil, roots and soft spots. Anything organic left under the patio will rot and settle, and the slabs above it will sink.

    3. Lay and compact the sub-base

    The sub-base is what stops a patio moving. Lay a geotextile membrane over the dug-out ground to separate the sub-base from the soil and slow weed growth. Then spread a crushed stone sub-base, usually sold as MOT Type 1, and compact it with a plate compactor.

    Compact it in layers rather than all at once, and shape the top to the same fall you want on the finished patio. A sub-base that is not compacted properly is the most common reason patios sink in places.

    4. Set the slabs on a full mortar bed

    Each slab should sit on a full bed of mortar, not on five dabs. Spot bedding leaves hollows under the slab where water collects, and the slab can rock or crack.

    • A common bedding mix is 4 parts sharp sand to 1 part cement. Use sharp sand, not soft building sand.
    • Spread enough mortar for one slab at a time, about 30mm deep and a little larger than the slab.
    • Lay the slab, tap it down with a rubber mallet and check it against your string line and level, including the fall.
    • Porcelain needs a primer slurry brushed onto the back of each slab so it bonds to the mortar. Keep it off the face, because it sets very hard.
    • Keep joints even with spacers. Bradstone recommends joints of at least 5mm for porcelain.

    Clean any mortar off the face of the slabs as you go. Once it has set it is much harder to remove.

    5. Fill the joints

    Once the bed has set, fill the joints. You can point them with mortar or use a brush-in jointing compound. Follow the instructions for whichever product you use, as some need the slabs to be wet or dry and some are not suitable for heavily textured paving.

    Keep people and furniture off the patio until the bed and joints have had time to cure. The jointing product's instructions will say how long.

    Common mistakes to avoid

    • Laying slabs straight onto soil or loose sand.
    • Skipping the compaction, or compacting the whole depth in one go.
    • Spot bedding instead of a full mortar bed.
    • No fall, or a fall towards the house.
    • Finishing too close to the damp-proof course.
    • Choosing a smooth slab for a shaded, damp spot, where it will turn slippery.

    Need a hand?

    If your garden slopes, access is tight or you would rather it was done properly first time, see our patios and decking and landscaping pages. We lay patios across Ilfracombe, Barnstaple and the rest of North Devon. Call or text Mike on 07881 207275 for a free quote.

    Related services: Landscaping, Patios & Decking.

    Quick answers

    For a typical garden patio, about 150mm in total: around 100mm of compacted sub-base, a 30mm mortar bed and the slab. Soft or clay ground may need more.

    A common bedding mix is 4 parts sharp sand to 1 part cement. Check your slab manufacturer's guidance, especially for porcelain.

    Not if you want it to last. Slabs laid on soil or loose sand move and rock. A patio needs a compacted sub-base and a full mortar bed.

    Free quote, no obligation